The Essential Package by AMR BuildTech is designed for clients who want Owners planning phased construction — complete RCC structure first, finishing later at own pace or budget.. Below you can view the complete scope, specifications, and inclusions in a transparent format.
The Essential package, RCC Grey Structure Construction, is ideal for plot owners in Bhopal who want to secure their RCC structure now and handle finishing — flooring, doors, paint, electrical — themselves or in a later phase. This is a common approach for NRI owners, owners with tight initial budgets, or those who want to do phased construction over 2–3 years. It is also the right choice when you want to let the slab cure thoroughly before committing to a finishing contractor.
A quick-reference summary of what defines the Essential package — see the full scope table and price-covers breakdown below for complete specifications.
The ₹699/sqft rate for the Essential package is built up from the following work items — each priced into the rate as material, labour and site supervision combined. This is the exact scope AMR BuildTech executes on site for this package, item by item.
Clearing of vegetation, debris and existing structures from the plot. Excavation of soil strata to the founding depth shown in the structural drawing. Normal soil excavation is included in the rate; hard strata, rock or murrum encountered below 3 ft is billed separately on actuals.
Isolated or strip RCC footings as per structural design, cast in M25 grade concrete. PCC (Plain Cement Concrete) bed laid below each footing to provide a level, stable base before reinforcement placement.
RCC columns cast from foundation level up to plinth level, using Fe415/Fe500 grade TMT steel (Nakoda / Goyal / Kamdhenu or equivalent approved brand) as per the structural drawing's bar bending schedule.
RCC plinth beam cast to tie all columns together at plinth level (up to 3 ft from road level), forming the base on which future brickwork will sit.
Roof slab for each floor cast in M20 grade concrete, including the staircase core structure. Shuttering, reinforcement placement and concrete pour are supervised on site before casting.
Minimum 21-day supervised water curing on all cast RCC elements. An AMR BuildTech engineer signs off on each stage — footing, columns, plinth beam, slab — before the next stage begins.
Indicative cost range: ₹699 – ₹950 per sqft. These are civil + finishing estimates — plot cost, boundary wall and interior furniture are not included.
| House Size / Type | Estimated Cost (Essential Package) |
|---|---|
| 600 sqft (small G ground floor) | ₹4.2 – ₹5.7 Lakh |
| 1,000 sqft (standard G floor) | ₹7.0 – ₹9.5 Lakh |
| 1,200 sqft (G floor on 30×40 plot) | ₹8.4 – ₹11.4 Lakh |
| 1,500 sqft (G floor on 30×50 plot) | ₹10.5 – ₹14.3 Lakh |
This table gives a transparent scope for the Essential package. Items marked ✅ are included, ❌ are not included, and NA means not applicable. Items marked ℹ show the specification or value.
| Scope Item | Specification / Inclusion |
|---|---|
| Finished Building Stage | ℹ Structure Only |
| Plinth Beam Height | ℹ Up to 3 ft (from road level) |
| Floor-to-Floor Height | ℹ 9.5 ft |
| Parapet Wall Height | NA No brickwork — not applicable |
| Boundary Wall Limit | NA Upgrade available on request |
| Curtain Wall (Below Road) | NA Not applicable in this stage |
| Earthwork / Excavation | ✅ Site clearance + excavation (hard strata extra) |
| Backfilling & Compaction | ✅ Standard compaction |
| PCC / Grit Slab | NA Upgrade available |
| RCC Structure | ✅ Footing + columns + plinth beam + slab + staircase |
| Steel Brand | ℹ Nakoda / Goyal / Kamdhenu / equivalent approved brand |
| Steel Grade | ℹ Fe 415 / Fe 500 as per structural drawing |
| Concrete Grade | ℹ M20 slabs/beams, M25 columns |
| RCC Curing Monitoring | ✅ Engineer QC — minimum 21-day curing |
| Brickwork / Masonry | NA Not applicable in this stage |
| Brickwork Type | NA No brickwork in this stage |
| Fly Ash Bricks Option | NA No brickwork in this stage |
| Plaster (Internal/External) | NA Not applicable in this stage |
| Concealed Conduiting | NA No brickwork available |
| Electrical Wiring | NA Not applicable in this stage |
| Plumbing | NA Not applicable in this stage |
| Flooring Finish | NA Not applicable in this stage |
| Staircase Finish | NA Not applicable in this stage |
| Main Door Height (Up to) | NA No door openings in this stage |
| Internal Door Height (Up to) | NA No door openings in this stage |
| Door Frames | NA No brickwork available |
| Windows | NA No brickwork available |
| MS Grill | NA No brickwork available |
| Kitchen Platform | NA Kitchen not formed in this stage |
| Sink | NA Kitchen not formed in this stage |
| Kitchen Dado Tiles | NA Kitchen not formed in this stage |
| Interior Paint | NA Not applicable in this stage |
| Exterior Paint | NA Not applicable in this stage |
| Elevation (Basic) | NA Not applicable in this stage |
| Modular Kitchen | NA Kitchen not formed in this stage |
| TV Unit | NA Not applicable in this stage |
| Wardrobe / Almirah | NA Not applicable in this stage |
| False Ceiling | NA Not applicable in this stage |
| Underground Tank | NA Upgrade available on request |
For a single-floor RCC structure (G floor). Timeline depends on plot size, column count and slab area. G+1 duplex structure takes 4–6 months.
Payment for the Essential package is structured so you only ever pay for work that is either about to start, already visibly in progress, or fully completed and inspected — never for work that exists only on paper. There are two parts to this: a one-time mobilisation advance paid in full upfront, followed by a repeating 50% / 25% / 25% pattern applied to every construction stage after that.
This is the only payment made before physical work starts, and it is paid in full — not in parts. It funds everything needed to convert your site from an empty plot into an active construction site: site layout marking, a makeshift storage shed for cement/steel/tools, barricading/fencing where required, appointment of a site guard/watchman if needed, initial material procurement (cement and steel booking), and deployment of the labour team. Without this advance, a contractor cannot reserve manpower or place material orders against your project — so this stage exists to convert your booking into an active, scheduled project rather than a pending enquiry. Once the mobilisation advance is paid, every stage after it follows the 50% / 25% / 25% pattern below — the mobilisation advance itself is a one-time, standalone payment and is not split.
For every subsequent construction stage (footing, columns, slab, brickwork, flooring, and so on), work only begins once the first half of that stage's payment is received. This covers the material and labour AMR BuildTech commits upfront to start the stage — steel, cement, bricks or tiles are procured and masons/labour are allocated specifically for that stage once this payment is in.
Once the stage is visibly halfway done — for example, columns cast on half the plot, or brickwork completed on half the walls — the next 25% is due. This checkpoint means you are paying in step with what you can actually see on site, not on a fixed date regardless of progress. It also keeps the project cash-flow moving so labour and material supply for the stage don't stall midway.
The last quarter of each stage's payment is due only once that stage is fully complete — this is deliberately the largest checkpoint held back until the work is finished and can be inspected. It gives you real leverage: if a stage isn't finished to specification, that final 25% simply isn't released yet. This same 50/25/25 pattern repeats for every stage through to final handover, so you're never more than one incomplete stage's worth of payment ahead of the physical work on site.
The exact stages billed depend on this package's scope — a structure-only package is billed only against RCC milestones, while a fully finished package also includes brickwork, electrical, plumbing, flooring and finishing milestones. Your formal agreement sets out the specific stage-wise schedule for your project before work begins, and all payments are made via bank transfer to AMR BuildTech's official account.
Site utilities — client-provided, free of cost: Water and electricity required for construction work must be arranged and provided by the client at the site, free of cost, for the entire duration of the project. This is separate from the mobilisation advance — mobilisation funds the contractor's own site setup (storage, guard, labour deployment), while ongoing water and electricity supply for construction activities remains the client's responsibility throughout execution.
| Upgrade / Add-on | Details |
|---|---|
| PCC / Grit Slab | Add PCC bed below slab level for better base — recommended for waterlogging-prone plots |
| Boundary / Compound Wall | Up to 5 ft compound wall on available frontage — quoted separately per running foot |
| Underground Water Tank | RCC underground sump tank (5,000–10,000 litre) — quoted separately |
| Hard Strata Excavation | If rock or hard murrum encountered below 3 ft — charged per cft as actuals |
| Upgrade to Starter | Add brickwork + plaster on top of Essential to reach Starter stage |
| Steel Grade | Fe 415 / Fe 500 (as per structural drawing) |
| Concrete Grade | M20 for slabs and beams; M25 for columns (standard design) |
| Cement Brand | Ultratech / ACC / Wonder / equivalent approved brand (43 or 53 grade as per design) |
| Warranty | 1-year structural defect responsibility on RCC work executed by AMR BuildTech. |
Select up to 3 packages and compare scope side-by-side with clear icons.
Compare PackagesWe will share proposal + costings + workflow + next steps.
WhatsApp for Essential Proposal