AMR BuildTech - Construction, Interior Design & Architecture company in Bhopal, Madhya Pradesh delivering residential and commercial projects
AMR BuildTech is a Bhopal-based construction, interior design, and architectural firm serving residential and commercial clients across Madhya Pradesh, including turnkey construction, interior fit-outs, and architectural planning.

Basic Construction Package in Bhopal

The Basic Package by AMR BuildTech is designed for clients who want Budget-conscious homeowners who want a completely functional, ready-to-move-in house at the lowest finished-building cost.. Below you can view the complete scope, specifications, and inclusions in a transparent format.

Finished Building (Budget) ₹ 1399 / Sqft ₹1,399 – ₹1,600 / sqft
WhatsApp for Proposal (Basic)
✅ Stage Based  •  ✅ Engineer Supervision  •  ✅ Transparent Execution
← Back to Packages

Who Is the Basic Package For?

The Basic package is for owners who need a fully functional, habitable house at the lowest possible finished-building cost. It covers every structural and civil element needed to move in — RCC structure, brickwork, plaster, a smooth cement floor, basic doors and windows, minimal electrical wiring, basic plumbing, and a whitewash finish — using the most economical specification at each stage. This package deliberately excludes floor tiles, wall putty, and multiple electrical points per room to keep the rate at its lowest tier; owners who need tiled flooring, painted (not whitewashed) walls, or a normal number of electrical sockets should look at the Standard package instead. Basic is commonly chosen for rental properties, worker housing, and first homes where the owner plans to upgrade finishes in a later phase.

Key Highlights of Basic Package

A quick-reference summary of what defines the Basic package — see the full scope table and price-covers breakdown below for complete specifications.

  • Completely finished, habitable house at the lowest budget specification
  • Cement floor with neat cement punning (hand-trowelled smooth finish) — no floor tiles
  • Minimal electrical wiring: 1 light point + 1 fan point per room, and only 1 power socket for the entire house
  • Basic plumbing points with CPVC pipes and sanitary fittings
  • Essential doors (flush) and windows (aluminium 2-track)
  • No wall putty — cement-based whitewash finish only, interior and exterior
  • Simple elevation plaster finish included

What the Basic Package Price Covers

The ₹1399/sqft rate for the Basic package is built up from the following work items — each priced into the rate as material, labour and site supervision combined. This is the exact scope AMR BuildTech executes on site for this package, item by item.

RCC Structure

Complete footing, columns, plinth beam, roof slab and staircase in M20/M25 grade concrete with Fe415/Fe500 TMT steel — the same structural specification used across all AMR BuildTech packages.

Brickwork & Plaster

Full internal and external brickwork in fly ash bricks or AAC blocks as per drawing, with standard internal and external cement plaster (single coat, no additional smoothing beyond plaster).

Cement Floor with Punning

No tiles are laid in the Basic package. Instead, the floor slab is finished with a neat cement punning — a hand-trowelled smooth cement surface, laid directly on the structural slab. This is a functional, low-cost floor finish; it does not include the hardener/colour topping used in IPS (Indian Patent Stone) flooring.

Minimal Electrical Wiring

Concealed copper wiring is limited to 1 light point and 1 fan point per room. The entire house is provided with only 1 power socket in total (typically located in the kitchen). No sockets are provided in bedrooms, living areas or other rooms — additional points require an electrician upgrade after handover.

Basic Plumbing

CPVC pipe plumbing for kitchen and toilet water points, with basic sanitary fittings. Overhead tank and fixture brand are kept at entry-level specification to control cost.

Doors & Windows

Flush doors on Dewas-section steel frames for main and internal doors. Aluminium 2-track (basic single-sliding) windows with a standard MS grill — no mosquito mesh track.

Whitewash Finish (No Putty)

No wall putty is applied at this tier. Interior and exterior walls receive a cement-based whitewash coat directly over plaster — a basic, breathable, low-cost finish rather than an emulsion or distemper paint.

Elevation

Simple plaster-finish elevation with no texture, cladding or design detailing — matching the plain internal wall finish.

Typical Cost Estimates — Basic Package

Indicative cost range: ₹1,399 – ₹1,600 per sqft. These are civil + finishing estimates — plot cost, boundary wall and interior furniture are not included.

House Size / Type Estimated Cost (Basic Package)
600 sqft ₹8.4 – ₹9.6 Lakh
1,000 sqft ₹14.0 – ₹16.0 Lakh
1,200 sqft ₹16.8 – ₹19.2 Lakh
1,500 sqft ₹21.0 – ₹24.0 Lakh

Basic Package — Full Scope & Specifications

This table gives a transparent scope for the Basic package. Items marked are included, are not included, and NA means not applicable. Items marked show the specification or value.

Scope Item Specification / Inclusion
Finished Building Stage Finished Building — Budget Ready-to-Move
Plinth Beam Height Up to 3 ft
Floor-to-Floor Height 9.5 ft
Parapet Wall Height Up to 2'6"
Boundary Wall Limit Up to 5 ft height, 33% of plot frontage
Curtain Wall (Below Road) Not included
Earthwork / Excavation Included
Backfilling & Compaction Included
PCC / Grit Slab Included
RCC Structure Footing + columns + plinth beam + slab + staircase
Steel Brand Nakoda / Goyal / Kamdhenu / equivalent approved brand
Steel Grade Fe 415 / Fe 500 as per structural drawing
Concrete Grade M20 slabs/beams, M25 columns
RCC Curing Monitoring Engineer QC curing monitoring
Brickwork / Masonry Fly ash brick / block masonry as per drawing
Brickwork Type Fly Ash Bricks / AAC Blocks
Fly Ash Bricks Option Standard for Basic package
Plaster (Internal/External) Both internal and external plaster included
Concealed Conduiting Included
Electrical Wiring Minimal wiring — 1 light point + 1 fan point per room; only 1 power socket for the entire house
Plumbing Basic plumbing points — CPVC pipes
Flooring Finish No tiles — cement floor with neat cement punning (hand-trowelled smooth finish)
Staircase Finish Cement punning finish on staircase — no tiles
Main Door Height (Up to) 7 ft
Internal Door Height (Up to) 7 ft
Door Frames Dewas Section (steel frame)
Windows Aluminium 2-track (basic single sliding)
MS Grill Basic MS grill on windows
Kitchen Platform Basic cement platform (no granite)
Sink Single bowl SS sink included
Kitchen Dado Tiles Not included
Interior Paint No putty — cement-based whitewash finish only, applied directly over plaster
Exterior Paint No putty — cement-based whitewash finish only, applied directly over plaster
Elevation (Basic) Simple plaster elevation finish
Modular Kitchen Not included
TV Unit Not included
Wardrobe / Almirah Not included
False Ceiling Not included
Underground Tank Upgrade available

Execution Timeline

Approx. 5–8 months
Estimated duration

For a single ground-floor complete Basic house. Structure (2–3 months) + brickwork/plaster (2 months) + finishing — flooring, doors, paint (1–2 months).

How Payment Works

Payment for the Basic package is structured so you only ever pay for work that is either about to start, already visibly in progress, or fully completed and inspected — never for work that exists only on paper. There are two parts to this: a one-time mobilisation advance paid in full upfront, followed by a repeating 50% / 25% / 25% pattern applied to every construction stage after that.

  • 1

    Mobilisation Advance — 100%, paid upfront before any work begins

    This is the only payment made before physical work starts, and it is paid in full — not in parts. It funds everything needed to convert your site from an empty plot into an active construction site: site layout marking, a makeshift storage shed for cement/steel/tools, barricading/fencing where required, appointment of a site guard/watchman if needed, initial material procurement (cement and steel booking), and deployment of the labour team. Without this advance, a contractor cannot reserve manpower or place material orders against your project — so this stage exists to convert your booking into an active, scheduled project rather than a pending enquiry. Once the mobilisation advance is paid, every stage after it follows the 50% / 25% / 25% pattern below — the mobilisation advance itself is a one-time, standalone payment and is not split.

  • 2

    50% before a stage starts

    For every subsequent construction stage (footing, columns, slab, brickwork, flooring, and so on), work only begins once the first half of that stage's payment is received. This covers the material and labour AMR BuildTech commits upfront to start the stage — steel, cement, bricks or tiles are procured and masons/labour are allocated specifically for that stage once this payment is in.

  • 3

    25% at halfway completion of the stage

    Once the stage is visibly halfway done — for example, columns cast on half the plot, or brickwork completed on half the walls — the next 25% is due. This checkpoint means you are paying in step with what you can actually see on site, not on a fixed date regardless of progress. It also keeps the project cash-flow moving so labour and material supply for the stage don't stall midway.

  • 4

    Final 25% on full completion of the stage

    The last quarter of each stage's payment is due only once that stage is fully complete — this is deliberately the largest checkpoint held back until the work is finished and can be inspected. It gives you real leverage: if a stage isn't finished to specification, that final 25% simply isn't released yet. This same 50/25/25 pattern repeats for every stage through to final handover, so you're never more than one incomplete stage's worth of payment ahead of the physical work on site.

The exact stages billed depend on this package's scope — a structure-only package is billed only against RCC milestones, while a fully finished package also includes brickwork, electrical, plumbing, flooring and finishing milestones. Your formal agreement sets out the specific stage-wise schedule for your project before work begins, and all payments are made via bank transfer to AMR BuildTech's official account.

Site utilities — client-provided, free of cost: Water and electricity required for construction work must be arranged and provided by the client at the site, free of cost, for the entire duration of the project. This is separate from the mobilisation advance — mobilisation funds the contractor's own site setup (storage, guard, labour deployment), while ongoing water and electricity supply for construction activities remains the client's responsibility throughout execution.

What Is Not Included

  • Water and electricity supply at site — to be arranged and provided by the client, free of cost, for the entire project duration
  • Any floor tiles — vitrified, ceramic or otherwise (cement punning floor provided instead)
  • Wall putty of any kind — walls are whitewashed directly over plaster, not painted
  • More than 1 light point + 1 fan point per room — no extra room electrical points
  • More than 1 power socket for the entire house — no sockets in bedrooms or living areas
  • Teak, hardwood or granite door frames (Dewas section steel frames provided)
  • Aluminium 3-track or UPVC windows (basic 2-track aluminium provided)
  • Kitchen platform granite (basic platform only — no granite slab)
  • Kitchen dado tiles
  • Interior or exterior emulsion/texture/designer paint
  • Elevation cladding, ACP or stone work
  • Modular kitchen, TV unit, wardrobes or false ceiling
  • Underground water tank (upgrade available)
  • Boundary wall beyond 5 ft or 33% frontage

Popular Add-ons & Upgrades

Upgrade / Add-on Details
Tile Flooring Upgrade from cement punning floor to vitrified tiles — moves to Standard package
Additional Electrical Points Add extra light/fan points per room and sockets across the house — quoted per point
Putty & Paint Finish Add wall putty with emulsion paint instead of whitewash — quoted separately or via Standard package
Granite Kitchen Platform Replace basic platform with granite slab + kitchen dado tiles
Aluminium 3-Track Windows Upgrade from 2-track to 3-track aluminium windows
Underground Tank Add RCC sump tank — quoted separately
Upgrade to Standard Add tiled flooring, putty + paint, full electrical points and better windows to reach Standard

Technical Specifications & Warranty

Steel Grade Fe 415 / Fe 500 (as per structural drawing)
Concrete Grade M20 slabs/beams, M25 columns
Cement Brand Ultratech / ACC / Wonder / equivalent (43 or 53 grade)
Warranty 1-year defect responsibility on structure and civil finishing works.

Frequently Asked Questions — Basic Package

Want to compare Basic with other packages?

Select up to 3 packages and compare scope side-by-side with clear icons.

Compare Packages
← Lower Package Starter ₹1099/sqft Higher Package → Standard ₹1699/sqft

Get a detailed proposal on WhatsApp

We will share proposal + costings + workflow + next steps.

WhatsApp for Basic Proposal
Basic Construction Package Bhopal  |  Basic House Construction Cost  |  Construction Packages in Bhopal  |  Fixed Price House Construction  |  AMR BuildTech Basic Package

Select Location

×